What Commercial Concrete Work Involves in Paterson, NJ
Commercial slabs carry far more than a driveway, so the engineering is heavier and the schedule matters. These eight stages apply to docks, lots, curbs and floors, with the thickness and steel set by the load:
- Site walk measures the area, notes the traffic, the drainage and the work that must stay open.
- Load review sets the slab thickness for car traffic, delivery trucks or forklifts.
- Permits are filed with the Division of Community Improvements and, for curbs and walks, the Streets Division.
- Demolition removes failed slabs and hauls the debris off site in the crew’s own trucks.
- Base work places compacted crushed stone to a design depth, graded to carry water to the drains.
- Steel of mesh or rebar sits at the depth the plan calls for, with dowels at the joints.
- The pour is placed in sections with planned joints, then finished to the surface the use requires.
- Curing keeps the surface damp and protected, and it is timed so the lot or dock can reopen fast.